91视频专区,91视频免费版网站,91视频男人的天堂,91视频免费黄色APP

Wuxi Shiding Construction Machinery Co., Ltd.
Hanging basket and accessories

Tel:

13301521628

Remove the front hoist inspection

Hoist before demolition, site operators to check details surrounding environment, removal of obstacles, delineated the danger zone and set up fences or warning signs. To set up special care when removing.
Before removing to a unified command, the operator should obey the leadership, close cooperation, in strict accordance with tests, order, security measures. Particular attention to the stabilization of the frame body even when removing the wall rod.
Demolition operations, non-throwing objects from a height downwards. Remove the lever and so timely liquidation is placed at a predetermined position, and neatly stacked.
Demolition should be "removed after the first take, after take the first demolition" order. Demolition hoist, the power must be cut off before demolition work after inspection is correct. Before removing the wall connecting rod, you should set up a temporary wind cable rope or a support frame body to ensure free height of not more than two standard section.
Before removing the gantry Tian Liang, should take firm measures to two columns, respectively, to ensure the stability of the single column. Demolition work should be carried out during the day, night work should be well lit, interruptions in operation, the firm should take temporary measures.
All hoist operator must be certified correct to wear helmets and seat belts.
2016/06/25 09:38:41 413 Click

CONTACT

網站地圖91视频在线视频 91视频下载污 91视频下载网址 91短视频免费看 91视频H污污 丝瓜污视频下载 茄子视频APP下载 91视频免费看 羞羞小视频网址 羞羞小视频免费